PREVAIL is establishing a European multi‑hub platform that empowers academia, research centres, and companies to develop, test, and experiment with AI hardware prototypes. This is enabled through advanced low‑power computing technologies developed by the four RTOs and tailored to specific application needs.
Our offering is built on three technological pillars: embedded non‑volatile memories (eNVM), 3D integration technologies (3D), and photonics and connectivity (SiPho&C).
Design Exploration, Enablement and Fabrication
The technologies proposed for the fabrication platform build on existing internal building blocks, which are further matured within the scope of the project and formalized in state‑of‑the‑art design flows, including the creation of distributable Process Design Kits (PDKs) compatible with standard commercial tools.
As the platform evolves, PREVAIL progressively deploys its R&D services, including technology development, design support, and demonstrator validation.
Explore below the full PREVAIL portfolio, including estimated availability and responsible partners.
OFFER | ACCESS TO | *DATE | CHANNEL | |
|---|---|---|---|---|
Silicon Photonics
| imec isipp300 PDK
| Q4/2026
| Europractice
| |
issip300 shuttles – MPW on demand
| Q4/2026
| Europractice
| ||
CEA-Leti Si-310 PDK
| 06/2025
| Europractice
| ||
CEA-Leti Si-310 – MPW on demand
| To be announced
| To be announced
| ||
eNVMs | imec STT-MRAM Virtual PDK
| Q4/2026 | Europractice | |
imec STT-MRAM shuttles on demand
| Q1/2028 | PREVAIL – imec | ||
CEA-Leti OxRAM Virtual PDK
| Available
| PREVAIL – CEA Leti
| ||
CEA-Leti FeRAM PDK
| Available
| PREVAIL – CEA Leti
| ||
CEA-Leti FeRaM shuttles on demand
| Q4/2025,
Q2/2027
| PREVAIL – CEA Leti
| ||
FhG FeRAM PDK
| To be announced
| PREVAIL – FhG
| ||
FhG FeRAM shuttles
| Planned every 6 months starting 07/2025
| PREVAIL – FhG
| ||
FhG FeFET PDK
| Available
| PREVAIL – FhG
| ||
FhG FeFET shuttles
| Planned every 6 months starting 07/2025
| PREVAIL – FhG
| ||
FhG FeMFET PDK
| Available
| PREVAIL – FhG
| ||
FhG FeMFET shuttles
| Planned every 6 months starting 07/2025
| PREVAIL – FhG
| ||
RF network | VTT RF network documentation
| 10/2025
| PREVAIL – VTT
| |
3D-Integration | 3-D Integration modules documentation (4RTOs)
| Available
| PREVAIL – RTOs
| |
3-D Integration modules fabrication facilities (4RTOs) | To be announced
| PREVAIL – RTOs
| ||
Demonstrators | Specific PREVAIL demonstrators’ process steps, modules, process integration flows, specs, access to manufacturing. | Starting Q3/2027
| PREVAIL – RTOs
|
Important notes:
Latest uptade 21/06/2026.
SIGN UP to receive first-hand news of the project and be part of the PREVAIL’s network.
For detailed technical enquiries regarding our offer, access and demonstrators go to CONTACT US.